North Thomas Road Sewage Pump Station Replacement-2013

Township funded replacement of an existing sewer pumping station originally placed into service in 1972.  Designed  & constructed to meet both current and future growth within the service district.

Construction Costs              $ 362,572.00                                   

Contractor:                         American Excavating, Saginaw MI

Equipment Supplier:             DuBois Cooper, Oxford MI

Engineer:                            Spicer Group, Saginaw MI

   

Coldbrook & Briarhill Water Main Loop-2014

Township funded additions of 12 inch water main connecting and exiting water mains currently that are currently dead-ended to existing 20 inch water transmission mains.  Construction anticipated in Spring, 2014.

Construction Costs               $ To be determined

Contractor:                         To be determined

Engineer:                            Spicer Group Saginaw, MI

   

Miller Road Water Main Replacement-2014

Township funded replacement of an existing water main that is part of the larger Miller Road Reconstruction Project.

Construction Costs:               $ To be determined

Contractor:                          To be determined

Engineer:                             OHM Advisors Saginaw, MI

                                           Saginaw County Road Commission

                                           Michigan Department of Transportation

   

East Gloucester Sewer Lift Station Upgrade-2014

Township funded upgrade of an existing sewer pumping station with new pumps, valves, and control systems.

Construction Costs:                                         $ 79,500 (estimate)

Equipment Supplier:                                        Kennedy Industries Wixom, MI

Mechanical & Electrical Contractor:                   To be determined